One Million Brazilians Have Been Displaced by Dams

March 14 was International Day of Action Against Dams and for Rivers, Water and Life. The International Movement Against Dams reports that there are 800,000 dams around the world which have caused the dislocation of some 80 million people.

In Brazil, according to the organization, since the 1970s a total of one million people have been displaced by dam construction.

International Day of Action Against Dams was commemorated in Brazil with demonstrations by representatives of social movements and environmental activists in the state of Rondônia.

The demonstrators protested the construction of two hydroelectric power plants on the Rio Madeira (the plants are known as Jirau and Santo Antônio).

The protests were led by an umbrella group known as the Forum for Debates on Rondônia Energy which congregates, among others, an energy research group at the local federal university (Grupo de Pesquisa em Energia Renovável e Sustentável da Universidade Federal de Rondônia) (Unir), the Indian Missionary Council (Conselho Indigenista Missionário) (Cimi) and the Land Pastoral Commission (Comissão Pastoral da Terra) (CPT) [which are both linked to the Catholic church], an environmental NGO "Canindé," an Amazon region work group (Grupo de Trabalho Amazônico) (GTA), a rubber tapper union (Organização dos Seringueiros de Rondônia) (OSR), the NGO Rio Terra and the Victims of Dams Movement (Movimento dos Atingidos por Barragens) (MAB).

The Forum has drawn up a list of problems the construction of the two power plants will cause. Among them: loss of areas of historical interest, the need to resettle 2,000 riverside inhabitants who do not have land deeds and will face burdensome difficulties in obtaining any indemnity besides losing their livelihood (they are fishermen), along with the negative impact on the Madeira River, its ecology and the fauna and flora in the region.

However, on the other hand, the Madeira River project is an important element in the Brazilian government’s development plans. With the construction of the two power plants the river will be navigable, making it possible to harvest soy grown in the Central-West region of Brazil and then transport it by river and highways across western Brazil and through Bolivia and Peru to the Pacific Ocean for export to Asia.

Agência Brasil

Tags:

You May Also Like

Brazil Opens Half-a-Billion-Dollar Line of Credit for Hotel Industry

Brazil’s Ministry of Tourism and the Brazilian Development Bank (BNDES), last week, established a ...

No Presidential Candidate in Brazil Gets Endorsement of King-Maker Marina from Green Party

Brazilian presidential candidate and Green Party Senator Marina Silva from the state of Acre ...

A Lot to Share

It was from Kerala that the Portuguese collected pepper and introduced it in Brazil. ...

Brazil to Teach World How to Fight Corruption

The United Nations will make use of Brazil’s experience in fighting municipal corruption as ...

Brazil and Uruguay Reinforce Scientific Ties

The governments of Brazil and Uruguay signed five cooperation agreements during Uruguayan President Tabaré ...

A Nine-Point Policy to Rescue Brazil’s Youth

At the inauguration of the Young Voices encounter in Brazil, the National Youth Secretary, ...

Brazil Ready to Produce Bird Flu Vaccine in Two Months

Isaias Raw, president of the Butantã Institute, in São Paulo, informed that within 60 ...

Learning to survive and thrive in Brazil

For Americans relocating to Brazil the move is frequently a cultural shock. How do ...

Congo Joins Africa Wave in Support of UN Seat for Brazil

The president of Congo, Denis Sassou Nguesso, has officially told President Luiz Inácio Lula ...

Brazil’s Wild West Has Largest Concentration of Slave Workers

The Brazilian states with the highest incidence of slave labor are Pará, Mato Grosso, ...