• Categories
  • Archives

Brazil Wants to Restart Work on Nuclear Plant Paralyzed in 1988

The director of Planning, Management and Environment at Eletronuclear – the Brazilian company that operates the Angra 1 and 2 nuclear power plants – LuÀ­s Hiroshi Sakamoto, says that Brazil will need another nuclear power plant to meet the demand.

That nuclear power plant is Angra 3, which, along with Angra 1 and 2, went into construction during the military administrations (1964-85).

Angra 1 and 2 have been completed and are operational, but Angra 3, scheduled to be operating in 1988, was never finished although US$ 750 million was spent on it.

It is estimated it costs US$ 20 million just to maintain it in its present state, and will take another US$ 1.8 billion and five years to complete.

All three of Brazil’s nuclear power plants are located closely together at a beach resort, Angra dos Reis, on the coast of the state of Rio de Janeiro 150 kilometers from the city of Rio de Janeiro.

Sakamoto points out that because they are clean, the use of nuclear power plants around the world means that two billion tons of carbon dioxide have not been pumped into the atmosphere, aggravating the greenhouse effect.

As for Angra 3, Sakamoto says Brazil has the know-how to conclude the construction and is ready to do so. "The country is going to need more energy and Angra 3 is an obvious candidate to supply it," he said.

The Brazilian official added that the fact that construction on it has already begun is a positive point. "What has been paid for is paid for. We will move ahead from where we are. There is no need to start from scratch. It means building Angra 3 will cost less than a similar plant anywhere in the world."

Sakamoto says that at the moment nuclear power (Angra 1 and 2) supplies 40% of the electricity used in the state of Rio de Janeiro. With Angra 3 in operation, that percentage will rise to 70%.

Agência Brasil

Tags:

  • Show Comments (0)

Your email address will not be published. Required fields are marked *

comment *

  • name *

  • email *

  • website *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Ads

You May Also Like

Brazilians Block Highway to Protest Rice Import

More than 250 rice producers in the state of Rio Grande do Sul, Southern ...

Good News for the Blind: Brazil Will Make Braille Typewriters

An agreement between the Brazilian Association to Aid the Visually Deficient, known as the ...

Laughing Stock

"Now we find out that all the recent American elections, done with the same ...

A prostitute in Vila Mimosa, Rio de Janeiro

While Jordan Brings Medical Tourists Brazil Does Sex Tourism

Twenty-five years ago, Princess Sarvath El Hassan of Jordan, wife of the then-Crown Prince ...

Brazil Goes After a Piece of Gulf’s Construction Boom

The civil construction sector grows 11.6% a year in the countries of the Gulf ...

Brazil Promises Electricity for All Brazilians by 2008

Brazil’s Minister of Mines and Energy, Silas Rondeau, said today that the Light for ...

Money Grows in Brazil at a Rate of 24% a Year

Brazil’s monetary base (money in circulation) grew 0.9% in September, reaching a total of ...

Brazil’s Right to Information Bill Still Far from International Standard

An amended version of the Brazilian draft Bill on Access to Information has been ...

Chavez Shoots Back in Word War with Brazil and Threatens to Leave Mercosur

Venezuelan president Hugo Chavez said he's willing to withdraw his country's request to become ...

100 Birds Die in Brazil. Country on Alert for Bird Flu.

100 birds died of unknown reasons in a farm in the city of Volta ...